Page 19

LK Armatur - Produktkatalog 2014 ENG

19 LK 810 ThermoMat W Eco ErP ready 2015 Registered Design Technical Data Voltage 230 VAC 50 Hz Power consumption 3-45 W depending on pump speed Max. boiler efficiency 60 kW at 20°C ΔT Return temperature 55°C, 60°C, 65°C or 70°C Working temperature Min. +5°C/Max. +110°C Ambient temperature Min. +5°C/Max. +60°C Max. working pressure 0.6 MPa (6 bar) Max. flow 2500 l/h Media Water - Glycol mixture max. 50% Thread standard Rp - female thread Circulating pumps Wilo Yonos PARA */6 RKC Material, valve body Brass EN 1982 CB753S Material, insulation Expanded Polypropylene EPP LK 810 ThermoMat W Eco is a loading unit for heating applications with solid fuel boilers and storage tanks. The loading unit is intended to ensure a high return temperature as well as an optimal temperature stratification in the storage tank, thus increasing the efficiency of the system. Tarring and condensation are prevented which prolongs boiler life. The LK 810 ThermoMat W Eco is a compact design with an integrated low-energy circulating pump, that fulfills the requirements of ErP 2015, and a thermic loading valve that regulates on two ports. The loading unit has three ball valves to simplify installation and maintenance, three thermometers that allow for simple control of the loading process and an insulation to minimize heat loss. The loading unit is available in two versions - with or without check valve. With a check valve the functions described under phase 4 will be obtained. LK 810 ThermoMat W Eco is installed in the return circuit between the solid fuel boiler and the storage tank. The unit should be mounted upright with the drive-shaft of the circulating pump in a horizontal position. The loading unit is reversible and can easily be adapted for mounting to the right or left of the boiler. The loading unit normally requires no maintenance. The installation should be checked regularly. Thanks to the three ball valves any part can be changed without draining the system in case of servicing. Loading Units | LK 810 ThermoMat W Eco The function of the loading unit during the different phases of heating: 1. Heat up phase The water circulates between boiler and loading unit while the temperature of the boiler is rising. 2. Loading phase The thermostatic element starts to open and allows return water from the storage tank to be mixed with supply water before it returns to the boiler. The return temperature to the boiler is kept constant. 3. End phase The thermostatic element is fully open and the bypass is closed. This results in an optimal transfer of heat from the boiler and the storage tank is filled with supply water. 4. Self-circulation with check valve Self-circulation will be obtained as soon as the fire has gone out and the circulating pump has stopped. The remaining hot water is loaded to the storage tank. In case of power failure or pump breakdown the check valve automatically opens to allow self-circulation. The check valve also stops recirculation from storage tank to boiler.


LK Armatur - Produktkatalog 2014 ENG
To see the actual publication please follow the link above